You're About to Find Out All About Tilt Up Construction

Tilt up combines the efficiency of design-build with the speed, strength and durability of reinforced concrete. Here is how it works.

November 8, 2022 5 min read CMIC Construction

Tilt up construction combines the efficiency of the design-build process with the speed, strength and durability of building with reinforced concrete. Panels are poured onsite and then assembled with cranes, creating attractive buildings built to last while saving on both materials and labor.

What This Article Covers

01

How a Tilt Up Building Goes Up

The slab is placed first and doubles as the casting bed.

02

Why Owners Choose It

You save on materials and labor, you get an energy-efficient structure with substantial thermal mass, and the build is typically faster than insulated concrete, metal or wood.

03

What It Takes to Do It Well

Tilt up rewards planning.

01

How a Tilt Up Building Goes Up

The slab is placed first and doubles as the casting bed. Wall panels are formed, reinforced and poured flat on that slab, then lifted into position and braced while connections and the roof structure follow. Because forming happens at ground level, the work is faster and safer than conventional wall construction.

02

Why Owners Choose It

You save on materials and labor, you get an energy-efficient structure with substantial thermal mass, and the build is typically faster than insulated concrete, metal or wood. Concrete walls also mean lower maintenance and better performance in fire and severe weather.

What It Takes to Do It Well, commercial construction guidance from CMIC Construction in Austin TX
03

What It Takes to Do It Well

Tilt up rewards planning. Panel layout, lifting sequence, embed placement and finish selection all have to be resolved before the slab is poured. Our division 3 pre-construction services include constructability and feasibility reviews so those decisions are made on paper rather than in the field.

Considering Tilt Up for Your Next Build?

Contact CMIC to talk through whether tilt up is right for your site and program. We will show you where the savings are and what the schedule really looks like.

Construction
CMIC Construction site team reviewing plans on a commercial job site
Start Here

Get a Real Budget 
and Schedule

Tell Us The Site, The Square Footage And The Opening Date You Are Working Toward. A CMIC Project Lead Will Walk You Through Scope, Permitting, Cost Drivers And A Realistic Construction Schedule.